AluminumDimensionHole

Machining Center Thermal Drift and the Accuracy of the First Part

A ball screw grows with the heat of the work itself, so warm the machine at the production feed and check the datum before the first part counts.

The first CNC machined aluminum part of a run, held in a steel machine vise with smooth jaws, a few droplets of coolant on its top face.

On a machining center that moves at about 10 m/min, a ball screw measured 110 µm longer at one end of its traverse after 40 minutes of repeated positioning. Most of that growth came in the first minutes after switch-on, and the control saw nothing wrong, because its loop closes on the motor’s rotary encoder and the screw’s pitch, not on the slide. A part with a hole pattern drilled on a cold machine and a contour milled an hour later can therefore carry a mismatch of more than a tenth of a millimeter between features that the drawing ties together.

HEIDENHAIN published the measurements in two technical information papers that machine builders still cite. They describe the effect in numbers, name the conditions under which it shows up and explain why batch sizes of a few parts make it worse. This piece follows the same evidence from the ball screw to the finished part and ends with the checks a buyer can write into an order.

Why a Cold Machine Cuts a Different Size Than a Warm One

A feed axis converts motor rotation to slide motion through a recirculating ball screw. When the control closes its position loop through a rotary encoder on the motor, the controlled quantity is the motor rotor position, and the slide position is inferred from the screw pitch. HEIDENHAIN describes this as semiclosed-loop operation and notes that wear or temperature changes in the mechanics cannot be compensated.

Heat enters the screw from the nut and the bearings every time the axis moves. The screw grows, the nut drifts along it, and the slide ends up farther along the axis than the control believes. Its length change, the paper says, is typically 100 µm/m within 20 minutes on machines without linear encoders.

Machine and program share the cause. One cutter path, run at a different average feed, produces a different heating pattern and a different drift, which is why one setup that was stable on Tuesday can shift on Wednesday when the part program changes.

Thermal drift is a property of how the machine was used in the last hour, not only of its size. A part cut on a cold machine and one cut after a long roughing cycle are cut on two different machines.

The same technical information points to a trend that sharpens the problem: batches are getting smaller. When a lot is five parts, there is no long stable stretch of production in which the temperature settles. The accuracy of the first workpiece becomes the accuracy of the order.

Roughing Heats the Axes and Finishing Does Not

The paper gives typical feed rates for roughing as 3 to 4 m/min and for finishing as 0.5 to 1 m/min, with tool-change positioning moves lifting the average speeds considerably. Milling rates, the share of time the axes move under cutting load, run above 80 % in roughing and below 10 % in finishing. The medium feed rates of drilling and reaming are negligible for heat in the screws.

The result is a machine whose thermal state is changed by the work itself. Constant change between setup, drilling, roughing and finishing keeps the screws from reaching a steady temperature, so a thermally stable condition cannot be reached for jobs that change often.

How Much a Ball Screw Moves and Over What Time

The numbers from the two HEIDENHAIN papers, with the conditions each was measured under, are collected below.

Table 1. Thermal growth of recirculating ball screws in semiclosed-loop operation, as published by HEIDENHAIN
Observation Value Condition
Typical length change of a screw 100 µm/m within 20 min Machines without linear encoders
Positioning error from coolant temperature change in a hollow, cooled screw Up to 10 µm over 1 m per 1 K Semiclosed loop, cooled core
Residual error after a thermal model in the control Up to 50 µm/m Models cannot see nut wear, feed rate, cutting force, traverse used
Position at the end farthest from the fixed bearing More than 110 µm in 40 min X axis, positioned 100 times at 10 m/min, mean 4 m/min, ISO/DIS 230-3 test
Thermal expansion time constant in a batch test Slightly less than 1 h Eight aluminum workpieces, 6 min per cycle

Common cooling systems, the paper adds, are often unable to hold the coolant to values significantly below 1 K, so cooled screws still move.

Two countermeasures inside the control or the screw appear in the paper, and both have limits. Some screws have hollow cores for coolant circulation, which keeps the screw from heating but ties its length to the coolant temperature. Other machines model the expansion in the control, which is difficult because the temperature profile along the screw depends on the wear of the ball nut, the feed rate, the cutting forces and the part of the traverse that is used. The paper’s figure of up to 50 µm/m of residual error after such a model is the number to keep in mind when a shop says a machine compensates for temperature.

Mechanical stiffness does not rescue the situation either. Fixing the screw at both ends raises rigidity, yet the heat generated locally still expands the screw, and the forces that result deform even the stiffest bearing arrangements and can distort the machine geometry. Mechanical tension also changes the friction of the drive, which the paper links to poorer contouring accuracy.

ISO/DIS 230-3 is the basis of the positioning test in the second paper. The axis moves repeatedly between two points near the ends of its traverse and a third at midpoint, and the change of each position against its initial value is recorded until the drift levels off. HEIDENHAIN notes that simpler gauges such as dial gauges can do this test, so any workshop can run it at a reasonable cost.

The First Minutes Carry Most of the Growth

The measured curve rose fastest right after switch-on. A change in mean feed in the production process therefore changes positioning accuracy immediately, not after a delay. Equilibrium came after about an hour in the batch test, but any interruption in machining makes the axis start drifting back in the reverse direction, and changing the part program, and with it the mean feed, again took about an hour to settle.

What the Drift Does to Two Features That Belong Together

Two worked cases in the papers show what a buyer would see on a part.

A Hole Pattern Drilled Cold and a Contour Milled Hot

An aluminum blank 500 mm long was drilled and reamed first, at feed rates low enough to put almost no heat into the screws. The contour was milled next, at higher mean feed. On a semiclosed-loop machine, the milled contour sat away from the drilled pattern by up to 135 µm, measured near the loose bearing of the screw. In closed-loop operation these errors were avoided.

The functional dimension was 12 mm from the hole position to the bisecting line of each part, required to tolerance grade IT8, which the paper gives as a permissible deviation of ±13 µm. All workpieces from the closed-loop machine were significantly within it. The semiclosed-loop parts reached 135 µm, which is the IT13 grade, not IT8.

Eight Workpieces Cut at Increasing Depth

The second experiment fixed eight aluminum workpieces of 70 × 70 mm on a vertical machining center. Four pockets and two radii were milled with four tools at 1 mm depth, and one cycle took 6 minutes for all eight parts. Nothing was exchanged between cycles: Z infeed went up by 1 mm and the program ran again.

The left sides of the finished parts show a step pattern that follows the thermal growth of the screw. It is most pronounced on the workpiece farthest from the fixed bearing and amounts to about 90 µm of drift in the X direction. Smooth right sides result from each shift in the positive X direction removing the previous step. The paper’s advice follows from the picture. Where further work is done on previously machined parts with critical dimensions, the machine datum has to be inspected and corrected continually.

A feature machined in the first cycle and a feature machined in the last cycle of the same lot can differ by tens of microns without any tool wear, from nothing but the screw’s temperature.

Bearings Decide Where the Thermal Zero Sits

How a ball screw is supported determines which positions drift least. The second paper compares three arrangements.

Table 2. Ball screw bearing arrangements and their measured thermal behavior, HEIDENHAIN 2006
Arrangement Where the thermal zero sits Measured or stated result
Fixed at one end, floating at the other At the fixed bearing Screw grows freely away from it; more than 110 µm at the far end in 40 min
Fixed at both ends Midpoint of traverse End points each moved 20 µm to 30 µm; total expansion about 50 % lower than fixed and floating
Fixed at one end, preloaded at the other Not stated in the test summary Distinct drift remained; bearing load harms service life at high mean velocity

A fixed bearing cannot hold a screw still. Restraining a 40 mm diameter screw against a temperature rise needs 2.6 kN for every degree Celsius, and a typical angular-contact bearing would quickly fail under a large increase. Real fixed bearings with their seats have a rigidity around 800 N/µm, which is why the bearings deform and the end points move.

The practical reading of the table is plain. A screw clamped at both ends shifts less and keeps its zero point near the middle, and the datum of a part programmed around the fixed bearing is the safest. Neither arrangement removes the drift.

How a Shop Checks an Axis for Drift

The 2006 paper describes the check in a few sentences, and it needs no more than a dial gauge and a stretch of machine time. ISO/DIS 230-3, cited there, proposes repeated positioning to two points as near as possible to the ends of the traverse range at an agreed percentage of the fastest positioning velocity. The change of each position against its initial value is recorded, and the test runs until the drift visibly levels off, which the paper calls a satiation effect.

In HEIDENHAIN’s own run, three positions were measured, the two ends and the midpoint. The axis was driven 100 times between them at 10 m/min, and standstill periods for taking readings brought the mean traversing speed to about 4 m/min. A second run, identical in everything else, used linear encoders for position feedback, so the two curves differ in nothing but the measuring system.

For a buyer the useful part is the ratio, not the instrument. The test shows how many micrometers the machine moves, how fast, and where the thermal zero sits. A shop that has run it on the machine assigned to the job can state a warm-up time from evidence instead of habit.

Closed-Loop Scales and What They Leave in Place

A linear encoder mounted on the slide includes the whole feed mechanics in the control loop. Play, pitch error and thermal growth of the screw all show up in the measured position and are corrected by the controller. In the HEIDENHAIN tests, positions measured with retrofitted linear encoders showed no drift, and the drilled and milled blanks cut in closed-loop mode stayed inside the ±13 µm band.

Closed-loop operation does not turn a machining center into a machine without thermal error. The paper states that the screw’s expansion often outweighs the machine’s structural deformation and geometric error, so it is the largest single contributor, not the only one. Spindle growth, column deflection and the temperature of the workpiece itself are separate matters outside these two documents.

Scale accuracy is also finite. The 2011 paper closes with the range of linear encoders HEIDENHAIN lists for numerically controlled machine tools, and the accuracy grade is a figure a shop can look up for its own scales.

Table 3. Accuracy grades and measuring lengths of linear encoder models listed in the 2011 paper
Model Type Accuracy grade Measuring length
LC 415 Absolute, slimline housing ±5 µm; ±3 µm to 2,040 mm (80.3 in)
LF 485 Incremental, slimline ±5 µm; ±3 µm to 1,220 mm (48.0 in)
LS 487 Incremental, slimline ±5 µm; ±3 µm to 2,040 mm (80.3 in)
LC 115 Absolute, full-size housing ±5 µm; ±3 µm to 4,240 mm (166.9 in)
LF 185 Incremental, full-size ±3 µm; ±2 µm to 3,040 mm (119.7 in)
LS 187 Incremental, full-size ±5 µm; ±3 µm to 3,040 mm (119.7 in)

A scale grade of ±3 µm is a bound on the measuring system, not on the part. Everything between the slide and the cutting edge, from tool length to workholding, stays outside it.

Questions That Separate the Two Machine Types

  1. Does each axis report its position from a linear scale on the slide or from the motor encoder?
  2. Is the first part of a lot cut after a warm-up that matches the production program’s feed?
  3. How is the datum re-checked during a long lot, and how often?
  4. Which characteristics were measured on the first part after the machine stood idle?

A Warm-Up and First-Part Check a Buyer Can Write Into the Order

A buyer cannot see inside a shop’s machines, but an order can state outcomes and evidence. The papers suggest the content.

  • Warm-up that resembles the work. A dry run at the part program’s mean feed, long enough to level the screws, brings the machine to the state the lot will run in. An idle machine started with the final finishing pass takes the cold error into the part.
  • Drilling and milling in the same thermal state. Where a hole pattern and a contour are tied by a tight dimension, the two operations belong in one thermally stable stretch, or the dimension needs an in-process check between them.
  • Datum check after a stop. After an interruption, the axis begins to drift in the reverse direction. A re-probed work offset, using a touch probe whose published unidirectional repeatability is as fine as 1.00 µm (40 µin) at 2σ, tested at 480 mm/min with a 50 mm stylus on Renishaw’s RMP60, shows the shift before the next part is cut.
  • First part from the production state. The first article is the sample that carries the thermal error. It is measured after the warm-up and again after a stretch of the lot.

Where a part has a dimension tied across two operations and a tolerance of tens of microns, ask which of these steps the supplier uses. A shop that can answer in terms of scales, warm-up and probing has addressed the cause, not the symptom. For a first lot of this kind, low-volume CNC machining puts the thermal state of the first parts on the record, and the same record then guides bridge production.

Sources and Further Reading

Request a Metal CNC Quote