Process Control

Process control is the set of procedures, solution checks and periodic tests a processor uses to keep a process such as anodizing or plating within its limits.

Every Process Control article of the Metal CNC Resources, newest first, each written from published standards, research and makers’ data.

Meaning

Process control is the set of procedures, solution checks and periodic tests a processor uses to keep a process such as anodizing or plating within its limits. Its test results describe the process line over a period, not a particular customer’s lot.

Anodizing Example

MIL-A-8625F shows the pattern. It requires the anodizer to keep a process control document describing every step, its times and temperatures, its solution limits and its current densities or voltages; to analyze every processing solution at least every two weeks; and to keep bath histories and analysis records for at least one year after the contract, available with test reports on request.
Read More

Periodic Tests

The specification’s Table II lists the process control tests: coating weight, coating thickness for Type III, corrosion resistance with at least five specimens for Types I, IB, IC, II and IIB, light fastness for dyed coatings and abrasion resistance for Type III. They run at least once a month with no interval over 35 days, and at the start of production after a pause of a month or more. Specimens can be production parts or panels in 2024-T3 or the month’s predominant alloy.

What a Result Proves

The specification states that these tests are accepted as evidence of the properties obtained with the anodizer’s equipment and procedures. A monthly salt spray panel therefore speaks for the tank, while a part from the order speaks for the order, and the two are different lines on a certificate. A failed process control test stops production until its cause is corrected.

In a Document Package

First article packages often ask for the process control evidence behind a part. General Dynamics OTS lists manufacturing plans, work instructions and process control plans sufficient to document the production process among the contents of a first article report, and AS9102 Form 2 records each special process with its specification, supplier and certificate number.

Certificates and Documents That Ship With a Machined Metal Lot

Each document proves something different, so the order names the certificate type, the traceability, the process reports and the inspection data it expects.

The Documents That Travel With a Machined Metal LotA lot of machined metal parts usually travels with four kinds of paper, each issued by a different party and each proving something different. Confusing them is the most common reason a file looks complete and is not.

ASTM B117 Salt Spray Testing of Anodized and Plated Machined Parts

B117 sets the fog but not the hours, specimens or pass mark, so the order has to name the coating specification, the rating method and what was tested.

What ASTM B117 Controls and What It Leaves to the OrderASTM B117 is a practice for operating an apparatus. Its scope covers the equipment, the procedure and the conditions needed to create and keep a salt fog environment, and the apparatus it describes sits in an appendix.

First Article Inspection Before a Machined Metal Run

A machined run ships only after its first article report is approved, so plan the first delivery around the report and not around the last part off the machine.

What a First Article Inspection Does Before a Run ShipsLockheed Martin UK's guidebook gives the purpose in three lines. A first article inspection provides objective evidence that all engineering, design, contractual and specification requirements are correctly understood, accounted for, verified and recorded.

Request a Metal CNC Quote

Send the 2D drawing and the 3D file, with the quantity and the stage of the project. An engineer replies within 1 working day.

The quote form, the mutual NDA and the private folder for your files are on Protolis Atelier, with Metal CNC chosen.

Request a Quote