Fixture

A fixture is the device that holds and locates a workpiece on the machine, so every part sits in the same place for the program.

Every Fixture article of the Metal CNC Resources, newest first, each written from published standards, research and makers’ data.

Meaning

A fixture is the device that holds and locates a workpiece on the machine, so every part sits in the same place for the program. It sets where the datum is and how the part is supported while it is cut and probed. Changing it is the largest physical step of most changeovers. For a part that repeats, the fixture is the asset that carries from one lot to the next.

Changeover Time

In the changeover study of these resources, removing the previous fixture came first. Preparing and clamping the new fixture took 8 minutes 36 seconds, and searching for it in the dispensing room took 5 minutes 20 seconds. Both counted against a changeover of 3 hours 26 minutes 32 seconds. Preparing the fixture during machine time moves that work out of the stopped machine.
Read More

Zero-Point Pallet

A zero-point clamping system seats a fixture on a standard receiving interface. The fixture arrives with the part on it, already measured against the interface. Its maker states at least 90 % less time for three activities, to 3 minutes at most. That saves about 22 minutes in the study’s figures, a maker’s figure and not one the authors measured.

Effect on the Datum

Probe length calibration on a known surface can compensate machine and fixture height errors. A Z datum set from a probe never calibrated that way carries the fixture’s height error into every depth. A thin wall or a lightly clamped part deflects under trigger forces of 0.75 to 5.30 N (0.17 to 1.19 lbf). The probe then measures the part as it sits in the fixture.

Change Effects

A changed fixture after a failed first article adds a cutting cycle, a measurement and a review to the calendar. A tool change is slow when a fixture has to be re-seated. Before passivation, anything a fixture left on the part is a contaminant to remove.

Cycle Time of a Machined Part From Program to Time per Part

Time per part is cutting, moving, changing and handling plus the lot's share of setup, so check what a quoted cycle time includes before comparing.

What Makes Up the Cycle Time of a Machined PartA CNC program's time has three machine components. Autodesk's help for the machining time tool in its CAM software defines the estimate as the sum of feed time, the time for non-cutting traverse moves at the machine's fastest rate, and tool-change time, and it reports each with its distance and the number of tool changes.

Roughing and Finishing Passes in CNC Milling From Stock to Final Size

Rough to an even allowance, program the feed for the chip each pass really makes, and finish with a small constant depth so size depends on the tool, not the stock.

Roughing to Finishing in Milling, Pass by PassA milled part rarely reaches its size in one cut. The material is removed in stages, each with its own job, its own tool and its own engagement, and each leaves the next a predictable amount of stock.

How Setup Time Sets the Lot Size of a Machined Run

Setup is paid once per lot, so in lots of five to twenty parts the changeover sets the calendar and lot size decides how many parts share it.

What a Setup Contains Before the First Good PartThe study names nine groups of activity that the changeover consisted of, in the order they were done. Removing the fixture from the previous job came first, then study of the clamping sheet and the drawing, cleaning the machine, clamping the new fixture, positioning the zero point, measuring the tools, clamping the tools into the magazine, producing the first piece, and inspecting it.

How Many Parts One Cutting Edge Makes in a Machined Run

The parts an edge makes equal its minutes of life divided by the minutes each part spends on it, so a faster cycle can use more edges than it saves.

What Decides How Many Parts a Cutting Edge Can MakeParts per edge is a quotient. The numerator is the tool life, the minutes a cutting edge can stay in contact with the workpiece before it reaches the wear criterion.

First Article Inspection Before a Machined Metal Run

A machined run ships only after its first article report is approved, so plan the first delivery around the report and not around the last part off the machine.

What a First Article Inspection Does Before a Run ShipsLockheed Martin UK's guidebook gives the purpose in three lines. A first article inspection provides objective evidence that all engineering, design, contractual and specification requirements are correctly understood, accounted for, verified and recorded.

Setting Work Offsets With a Touch Probe Inside the Machine

A probe writes the part's datum into the work offset, so its calibration, its limits and its re-probe points decide how far the first parts can be trusted.

How a Probe Sets a Work Offset Before the First CutThe sequence on a machining center runs the same way for most parts. A probe is loaded in the spindle like a tool, and the control treats it as one.

ASTM A967 Passivation for Machined Stainless Steel Parts

ASTM A967 names the baths and the lot tests for passivated stainless parts, and the drawing has to name the treatment, test and edition it wants.

What ASTM A967 Covers and What It Does NotASTM A967/A967M covers chemical passivation treatments for stainless steel parts, along with recommendations and precautions for descaling, cleaning and passivating. The abstract names three families of treatment: immersion in a nitric acid solution, immersion in a citric acid solution, and an electrochemical treatment.

Request a Metal CNC Quote