Three forged and peeled billets, 250 mm (9.84 in.) across and 3,141 mm (123.7 in.) long, left a German steel works with a certificate that a research laboratory later posted as an example. Beside each result sits its requirement: a 0.2 % proof stress of 320 N/mm² (46.4 ksi) against at least 300, a tensile strength of 632 N/mm² (91.7 ksi) against at least 600, elongation of 52.3 % against at least 35, and hardness readings between 160 and 172 HB against a band of 160 to 190. At the foot, one line notes that the certificate was generated by a data system and is valid without a signature. Every machined part cut from those billets inherits that page, and whether a buyer can still find it when a part is questioned depends on documents most orders never describe.
The Documents That Travel With a Machined Metal Lot
A lot of machined metal parts usually travels with four kinds of paper, each issued by a different party and each proving something different. Confusing them is the most common reason a file looks complete and is not.
| Document | Issued by | What it states | What it proves |
|---|---|---|---|
| Material certificate, EN 10204 or ISO 10474 type | the material producer, sometimes with an independent inspector | chemistry, mechanical results, heat or cast, standard | that the raw material met its specification |
| Process certificate | the anodizer, plater, heat treater or passivator | process, specification, class, results where ordered | that a special process was done to a named specification |
| Certificate of conformance | the supplier of the parts | that the lot meets the order, drawing and specifications | the supplier’s signed statement, with or without data |
| Inspection report | the supplier’s inspection | measured values of drawing characteristics | what was actually measured, and on how many parts |
A first lot often adds a fifth, the first article inspection report. Lockheed Martin UK’s first article guidebook for its suppliers, built on AS9102, expects the first article package to include a certificate of conformance for every part and material on the parts list, and lists missing certificates, test reports and forms among the common reasons a package is rejected.
A certificate of conformance says the lot passed. A material certificate says the bar passed. Only an inspection report says what the parts measured.
Material Certificates Under EN 10204 and ISO 10474
Material certificates follow a small family of standards with matching type numbers. The contents of ISO 10474:2013, “Steel and steel products, Inspection documents”, as published by DIN, set out the structure: documents based on non-specific inspection, the declaration of compliance with the order “2.1” and the test report “2.2”, and documents based on specific inspection, the inspection certificates “3.1” and “3.2”. Further clauses cover documents supplied by an intermediary and the validation of inspection documents.
LRQA’s overview guide to EN 10204 Type 3.2 adds the European side. EN 10204:2004 defines four certificate types and applies to all metallic products, including plates, sheets, bars, forgings and castings.
| Type | Name | Basis of inspection | Validated by |
|---|---|---|---|
| 2.1 | declaration of compliance with the order | non-specific | not described in the opened documents |
| 2.2 | test report | non-specific | not described in the opened documents |
| 3.1 | inspection certificate | specific | the manufacturer’s inspection representative, as printed on a published example; no independent third party |
| 3.2 | inspection certificate | specific | the manufacturer’s authorized inspection representative, independent of manufacturing, and the purchaser’s representative or an inspector designated by official regulations |
The line between 2.2 and 3.1 is the one that matters most to a machined part. In the usual reading of the standard, a 2.x document rests on non-specific inspection, results that describe the product type rather than the material delivered, while a 3.x certificate reports tests on the delivered product itself. For a part whose strength or chemistry is a design characteristic, the difference is whether the numbers on the page describe the bar the part was cut from.
Machined parts rarely come from the mill directly. They come from bar or plate bought from a stockist and cut many times, which is why the clause on documents supplied by an intermediary exists. A buyer receiving a mill’s 3.1 certificate through a stockist and a machine shop is relying on every link keeping the heat number attached to the material.
Reading a 3.1 Certificate Line by Line
The certificate CERN posted as an example shows what a complete 3.1 carries. It is headed as a certificate of material tests according to DIN EN 10204, typed 3.1, and every line on it answers a question a buyer would otherwise have to ask.
| Field | Value on the example | What it lets a buyer check |
|---|---|---|
| Certificate type and standard | 3.1, DIN EN 10204 | the type the order asked for |
| Certificate number | printed with page numbers | that the copy in the file is the one issued |
| Customer order and works order numbers | both printed | that the certificate belongs to this purchase |
| Product and dimensions | forged, peeled round billet, 250 mm × 3,141 mm (9.84 × 123.7 in.), quantity 3 | that the form and size match the stock used |
| Material and requirement | 1.4429, X2CrNiMoN17-13-3, AISI 316 LN ESR, to a named customer specification and edition | that grade and specification match the drawing |
| Melting process and heat | E-AOD-VD with ESR remelting, heat and test numbers | traceability back to the melt |
| Heat treatment condition | solution annealed | the condition the drawing assumes |
| Chemical analysis | values by element | composition against the grade limits |
| Mechanical results | Rp0.2 320 N/mm², Rm 632 N/mm², A5 52.3 %, Z 78 % at room temperature | results against the stated minimums |
| Hardness | 160 to 172 HB against 160 to 190 | the band for the stated condition |
| Microstructure and grain size | austenite, grain size to ASTM E112, free of segregation | metallurgical requirements, where ordered |
| Validation | inspector representative and stamp; generated by data system, valid without signature | who validated the results |
Two lines deserve a buyer’s attention. The requirement line names the specification and edition the material was tested against, so a mismatch with the drawing shows immediately. The heat number is the thread back to the melt, and LRQA’s guide explains how it is normally carried on the material itself, by hard stamping, etching or stencilling, so that the paper and the bar can be matched.
The heat number is the only link between the certificate and the part. A cut-off with no marking left on it has lost that link, whatever the file holds.
Type 3.2 and Intent of 3.2 Certification
Some orders require more than the producer’s own validation. LRQA describes a true Type 3.2 as produced by the manufacturer with its test results and witnessed by a third-party inspector, who verifies identification and traceability through objective evidence. Both manufacturer and purchaser, in the guide’s words, declare that the products comply with the order and that the required results were supplied.
The guide sets out the inspector’s three stages.
- At the manufacturer, the inspector identifies the material, makes a visual examination and sample dimensional checks, confirms traceability back to the ladle analysis, selects material for testing and transfers its identity to the test piece.
- At the test house, either a department independent of production or an accredited independent laboratory, the inspector witnesses tensile, impact, bend or hardness tests, reviews metallurgical tests such as corrosion or structure, and checks the results.
- On a final visit, the inspector verifies the material against the specification, countersigns the 3.2 certificate and hard stamps the material.
For material already in a stockist’s hands, the guide describes “intent of” Type 3.2. The material arrives with the producer’s 3.1, which no independent party has validated; an independent inspector then visits the stockist, confirms identity and traceability back to the ladle analysis through that 3.1, has any further tests witnessed, and endorses the documents. The guide’s own name for it signals the limit: it follows the intent of 3.2 rather than being a 3.2 issued at the mill.
For a machined part, a 3.2 requirement reaches back to the material purchase. It is decided before the bar is bought, not after the parts are cut.
The Certificate of Conformance and What It Certifies
A certificate of conformance is the supplier’s signed statement about the whole lot. The US Federal Acquisition Regulation clause 52.246-15, Certificate of Conformance (April 1984), gives the wording used on government contracts, and it is a useful model for any buyer.
Under that clause the contractor certifies that on a stated date it furnished the supplies called for by the contract, by a named carrier and shipping document, in accordance with all applicable requirements, and that the supplies are of the quality specified and conform in all respects with the contract requirements, including specifications, drawings, preservation, packaging, packing, marking and physical item identification by part number, in the quantity shown. The certificate is attached to the inspection or receiving report, and a copy travels with the shipment.
The same clause states what the certificate does not do. It is used only when the contract administration office authorizes it in writing for supplies that would otherwise be inspected at source, it does not prejudice the government’s right to inspect, and the government keeps the right to reject defective supplies within a reasonable time after delivery, with the contractor replacing, correcting or repairing them.
That is the honest scope of any certificate of conformance. It says that something passed and who stands behind the statement. Whether it also says what was tested, and with what result, depends on what the order asked for. Lockheed Martin UK’s guidebook draws the same line inside a first article package: a laboratory report or certificate of test included in the package has to show the specific values of the requirements and the actual results, while a statement of conformance is acceptable for characteristics verified by attribute or by visual comparison.
A certificate of conformance that names the drawing revision, the specifications with their editions, the lot and the quantity can be checked later. One that states only that the parts conform to the order says little more than the invoice does.
Process Certificates for Coatings and Treatments
Special processes leave their own trail, and the specification behind each one sets what can be asked for. MIL-A-8625F, the anodic coating specification, shows the pattern. It requires the anodizer to keep a process control document describing every step, its time and temperature ranges and its solution limits; to analyze every processing solution at least every two weeks; and to keep the bath history and analysis records for not less than one year after the contract is complete, available with the test reports when the purchaser asks.
Those records exist whether or not a buyer requests them, and test reports are delivered only when the contract calls for them. The specification’s acquisition section lists a data item for test and inspection reports to be ordered through the contract. It also notes that when a drawing names no anodic coating type, the contractor may furnish Type I, IB, IC, II or IIB within the specification, and when no class is named, either Class 1 or Class 2. A process certificate then reports what the processor chose, not necessarily what the designer intended.
The first article form that Lockheed’s guidebook describes, AS9102 Form 2, shows how process documents are tied to a part. For every material and special process it records the name, the specification with its revision and class, the supplier with name and address, whether the customer approved that source, and the number of the certificate: a special process completion certification, a raw material test report, a compliance report or a traceability number. The guidebook adds that special process certifications should be to the latest revision.
Inspection Report Format for a Machined Lot
The inspection report is the document that describes the parts themselves, and its format decides whether it can answer a question months later. Lockheed’s guidebook, written for first article reports, sets expectations that apply equally to a lot inspection report.
- Every characteristic is numbered and traceable to a balloon on the drawing, and attached reports trace to those numbers.
- Measured values, not verdicts: any note that carries a dimension gets a physical measurement, and “accept” or “OK” is not allowed for it.
- CMM output with real values: a coordinate measuring report that shows only deviations from nominal on several axes is not acceptable; the report shows the actual geometric value.
- Attribute and visual checks carry a statement of conformance and, where a master sample or standard is used, its identifier.
- Gauges and tooling are identified, with the gauge value or range where qualified tooling makes the decision.
- Inspection equipment has enough measurement accuracy for each requirement, and is recorded on the report.
- Nonconformances carry a reference number and their disposition.
The guidebook’s list of common rejections reads like a checklist for any report: wrong or incomplete part numbers, revision levels that do not match the purchase order, wrong tolerances read from the title block, and missing certificates from sub-tier suppliers. Each is a mismatch between documents rather than a defect in the parts.
Writing the Document Requirements Into the Order
A document arrives in the form the order asked for, or in the form the supplier finds easiest. The specifications above all leave the choice to the purchase order: the certificate type, the test reports, the inspection data and the rules for sources.
- Material certificate: the type, 3.1 or 3.2, and the standard, EN 10204 or ISO 10474, with the material specification and edition.
- Traceability: heat or cast number carried from the certificate to the lot, and how it is kept on cut stock.
- Process certificates: the specification, type and class for each coating or treatment, and whether test reports are delivered or only kept.
- Certificate of conformance: its content, naming the drawing revision, specifications, lot and quantity.
- Inspection report: characteristics measured, sample size, actual values, and the instruments used.
- Retention: how long the supplier keeps the records behind each document.
For a buyer moving a part from a first article to repeat lots, these requirements are the part of the order that does not change from one delivery to the next. They can be settled once, before release, alongside reading about low-volume metal CNC and bridge production, so that the hundredth part ships with the same paper as the first.
Sources and Further Reading
- ISO 10474:2013-07 (E), Steel and steel products, Inspection documents, contents, DIN
- EN 10204 Type 3.2 certification, Overview guide, 2023, LRQA
- Certificate of material tests according to DIN EN 10204, type 3.1, example, CERN Indico
- FAR 52.246-15, Certificate of Conformance (April 1984), US General Services Administration, Acquisition.gov
- SQAG 001, First Article Inspection Guidebook, Issue 6, February 2026, Lockheed Martin UK Ampthill
- MIL-A-8625F, Anodic Coatings for Aluminum and Aluminum Alloys, 10 September 1993, US Department of Defense