Certificate of Conformance

A certificate of conformance is the supplier's signed statement that a lot meets the order and the standards it names.

Every Certificate of Conformance article of the Metal CNC Resources, newest first, each written from published standards, research and makers’ data.

Meaning

A certificate of conformance is the supplier’s signed statement that a lot meets the order and the standards it names. It says that something passed. Whether it also says what was tested, and with what result, depends on what the order asked for.

What It States

ASTM A967 does not require a numeric result for passivation. Its acceptance is a chemically clean surface and a pass on a qualitative test. A certificate that states only that the lot passed therefore says little. One that names the practice, the edition, the result and the lot number can be checked later. An anodizer’s certificate, by contrast, can quote weights, thicknesses and salt spray hours.
Read More

In a Passivation Order

A plausible passivation note ends with a certificate of conformance carrying the lot number. The same note names the treatment, the test practice on each lot and the final rinse limit. Each clause answers one open point of the standard, so the certificate has something definite to confirm. A buyer can ask before the order what the certificate will state. A shop using a proprietary bath should also be able to show the test record for the same grade.

First Article Package

General Dynamics OTS lists a certificate of conformance in every first article report, beside all material and special process certifications. Lockheed Martin UK counts missing certificates of conformance and missing test reports among the errors that get a report rejected. A part that may be good then waits on paperwork, since nothing in the lot ships until the report is approved.

Certificates and Documents That Ship With a Machined Metal Lot

Each document proves something different, so the order names the certificate type, the traceability, the process reports and the inspection data it expects.

The Documents That Travel With a Machined Metal LotA lot of machined metal parts usually travels with four kinds of paper, each issued by a different party and each proving something different. Confusing them is the most common reason a file looks complete and is not.

First Article Inspection Before a Machined Metal Run

A machined run ships only after its first article report is approved, so plan the first delivery around the report and not around the last part off the machine.

What a First Article Inspection Does Before a Run ShipsLockheed Martin UK's guidebook gives the purpose in three lines. A first article inspection provides objective evidence that all engineering, design, contractual and specification requirements are correctly understood, accounted for, verified and recorded.

ASTM A967 Passivation for Machined Stainless Steel Parts

ASTM A967 names the baths and the lot tests for passivated stainless parts, and the drawing has to name the treatment, test and edition it wants.

What ASTM A967 Covers and What It Does NotASTM A967/A967M covers chemical passivation treatments for stainless steel parts, along with recommendations and precautions for descaling, cleaning and passivating. The abstract names three families of treatment: immersion in a nitric acid solution, immersion in a citric acid solution, and an electrochemical treatment.

Request a Metal CNC Quote

Send the 2D drawing and the 3D file, with the quantity and the stage of the project. An engineer replies within 1 working day.

The quote form, the mutual NDA and the private folder for your files are on Protolis Atelier, with Metal CNC chosen.

Request a Quote