Measurement

Measurement is the act of giving a feature a number, with a method, an instrument and a condition that let someone else repeat it.

Every Measurement article of the Metal CNC Resources, newest first, each written from published standards, research and makers’ data.

Meaning

Measurement is the act of giving a feature a number, with a method, an instrument and a condition that let someone else repeat it. A number without those three is a reading, and a reading cannot settle a dispute between a buyer and a shop. The same part can give two numbers on two supports or at two temperatures. The method says how the value was taken. The instrument says how fine it could be, and the condition says what the part was doing at the time.

Stated Method

A burr height reported without its measuring method is a claim. The burr study in these resources used a mechanical height gauge of 13 µm (0.0005 in.) sensitivity and drilled each condition four times. Lockheed Martin UK’s first article guidebook rejects a visual inspection method used for a dimension. It requires a physical measurement for every note that contains a dimension, with the method and the equipment on the report. GKN Aerospace refuses raw coordinate measuring machine data for a positional tolerance and asks for the actual positional value. For a bore with an IT grade, the buyer writes the method of measurement on the drawing. For the pitch diameter of a thread, the buyer asks for a value on the inspection plan, and the shop names the method.
Read More

Stated Condition

Support and temperature change the number without changing the part. A plate 3 mm (0.12 in.) thick on two end supports 300 mm (11.8 in.) apart sags about 54 µm (0.0021 in.). Measured lying on a surface plate, the same plate reads flat by that amount more. A 25 mm (0.98 in.) aluminum bore grows 11.8 µm (0.0005 in.) for a 20 °C (36 °F) rise. That is 91 % of its IT6 band. ISO 286 fixes nothing about the reference temperature. The drawing therefore states the temperature at which the grade applies, and the inspection room holds it.

Uncertainty

Every instrument has a published figure, and every figure has conditions. The RMP60 probe repeats to 1.00 µm (40 µin) at two standard deviations, by Renishaw’s figure. That figure holds for repeated touches of one surface from one direction, at 480 mm/min (18.9 in/min) with a 50 mm (1.97 in.) stylus. It does not include run-out, machine positioning, thermal growth, fixture deflection or a dirty surface. Clamping forces also change a measured size, so a shop can relate probe readings to a coordinate measuring machine once and store the difference. Lockheed asks for equipment at least 10 times finer than the accuracy required.

Probe Write-Back

A probe in the machine turns a few touches into a feature position, a size or both. A measurement macro then writes the result into a work offset or a tool offset. Three inputs decide how far the machine may act on that number. An upper tolerance limit stops the cycle with an alarm and updates nothing. A null band sets a zone around nominal where no correction is made. An experience value adds a stored adjustment that relates the probe to a coordinate measuring machine.

Axis Drift Test

A machine can be measured as well as a part. ISO/DIS 230-3 proposes repeated positioning to two points near the ends of an axis, at an agreed share of its fastest speed. HEIDENHAIN read three positions, the two ends and the midpoint, and drove the axis 100 times between them at 10 m/min (32.8 ft/min). Each position was read against its first value until the drift leveled off. Dial gauges are enough for the test, so a shop can state a warm-up time from evidence instead of habit.

Place in the Run

Measurement takes time, and that time sits inside the schedule of a run. In the changeover study of these resources, the first piece waited 58 minutes 26 seconds to be inspected. A formal first article report takes longer still, so the buyer’s schedule belongs to the measuring room as much as to the spindle. HEIDENHAIN’s drift measurements show why the timing matters. A ball screw grew more than 110 µm (0.0043 in.) in 40 minutes. A part cut cold and one cut an hour later come from two different machines.

Certificates and Documents That Ship With a Machined Metal Lot

Each document proves something different, so the order names the certificate type, the traceability, the process reports and the inspection data it expects.

The Documents That Travel With a Machined Metal LotA lot of machined metal parts usually travels with four kinds of paper, each issued by a different party and each proving something different. Confusing them is the most common reason a file looks complete and is not.

Surface Roughness Ra by Machining Operation From Roughing to Grinding

The feed and nose radius of the last pass set the finish, so pick the process from the Ra band and measure with the cutoff the profile calls for.

Typical Ra From Turning, Milling and GrindingEach process leaves its own range. Keyence, a maker of roughness and profile instruments, publishes typical Ra values for finishing operations and stresses that real results depend on material, tooling and parameters.

Position Tolerance of Machined Hole Patterns Under ISO 1101 and ASME Y14.5

A position frame sets a round zone around exact locations from datums, and its material modifier decides whether that zone grows as the holes grow.

What a Position Tolerance on a Hole Pattern ControlsA position tolerance limits where the axis of a hole may lie. PTC's glossary of model-based definition terms, which sets the ASME and ISO wording side by side, defines it as a zone within which the center, axis or center plane of a feature of size may vary from a true, theoretically exact position.

ISO 1302 and ASME Y14.36 Surface Texture Symbols on a Machined Part Drawing

A surface symbol is read against the edition it cites, and its parameter suffix, lay mark and empty positions decide how the face is cut and inspected.

Which Standard Governs a Surface Texture Symbol TodayThe ISO symbol on most drawings in circulation was drawn to ISO 1302:2002, and that edition is now withdrawn. ISO's own catalogue page lists ISO 1302:2002 as withdrawn and names ISO 21920-1:2021 as the new version.

How Setup Time Sets the Lot Size of a Machined Run

Setup is paid once per lot, so in lots of five to twenty parts the changeover sets the calendar and lot size decides how many parts share it.

What a Setup Contains Before the First Good PartThe study names nine groups of activity that the changeover consisted of, in the order they were done. Removing the fixture from the previous job came first, then study of the clamping sheet and the drawing, cleaning the machine, clamping the new fixture, positioning the zero point, measuring the tools, clamping the tools into the magazine, producing the first piece, and inspecting it.

First Article Inspection Before a Machined Metal Run

A machined run ships only after its first article report is approved, so plan the first delivery around the report and not around the last part off the machine.

What a First Article Inspection Does Before a Run ShipsLockheed Martin UK's guidebook gives the purpose in three lines. A first article inspection provides objective evidence that all engineering, design, contractual and specification requirements are correctly understood, accounted for, verified and recorded.

Setting Work Offsets With a Touch Probe Inside the Machine

A probe writes the part's datum into the work offset, so its calibration, its limits and its re-probe points decide how far the first parts can be trusted.

How a Probe Sets a Work Offset Before the First CutThe sequence on a machining center runs the same way for most parts. A probe is loaded in the spindle like a tool, and the control treats it as one.

ISO 965 6H Tolerance for Tapped Holes in Machined Metal

A 6H tapped hole has a band measured in hundredths of a millimeter, and a coating can use up most of it before the part is checked.

What 6H Means on a DrawingISO 965-1 sets the system for ISO general purpose metric screw threads. A tolerance class is written as a figure for the tolerance grade followed by a letter for the tolerance position, a capital letter for an internal thread and a small letter for an external one.

ISO 286 IT Grades for Machined Holes and Shafts

An IT grade fixes the width of a size tolerance by nominal size, and temperature can use up most of the band before a part is measured.

What an IT Grade StatesISO 286 defines international tolerance grades for nominal sizes up to 3.15 m. A grade is a number prefixed with IT, from IT01 and IT0 through IT1 to IT18, and as the grade number rises the tolerance rises with it, and for a larger nominal size at the same grade it rises again.

Flatness of Machined Metal Plates

A plate's measured flatness depends on the stress in its stock, its temperature and its support, as well as on the cut that finished it.

What Flatness General Tolerances AllowA machined plate leaves the mill with faces cut flat. Where the drawing gives a face no flatness of its own, ISO 2768-2 sets the tolerance it is held to.

Request a Metal CNC Quote

Send the 2D drawing and the 3D file, with the quantity and the stage of the project. An engineer replies within 1 working day.

The quote form, the mutual NDA and the private folder for your files are on Protolis Atelier, with Metal CNC chosen.

Request a Quote