Meaning
Inspection is the check of a part or a lot against its requirements, ending in a decision to accept, reject or hold it. It can be visual, dimensional or a test on a sample. What makes it useful is a criterion stated before the check begins. A phrase such as “free of burrs” or “clean” is not a criterion until it carries a size or a test.Acceptance Criterion
ASTM A967 states acceptance for passivated parts as a chemically clean surface with no etching, pitting or frosting on visual inspection. Qualitative tests that look for free iron then follow, and the summaries opened for these resources give no numeric pass or fail value. The listed practices include water immersion, high humidity, salt spray, copper sulfate and potassium ferricyanide-nitric acid tests. ISO 13715 turns an edge into an inspectable requirement with a sign and a size. A drawing note that says only “break sharp edges” leaves the inspector nothing to measure. Inspection language that says “free of burrs” needs a size behind it for the same reason.Read More
Stated Condition
A flatness reading depends on how the plate is supported, so the drawing or the inspection plan names the support. A bore held to IT6 depends on temperature, so the inspection room has to hold the stated temperature. A size inspection that agrees with the grade on the drawing is part of every bore with a fit. Where a thread is coated, ISO 965-2 checks it after coating with a GO plug gauge at the specified torque. A value for the pitch diameter, in micrometers, is asked for on the inspection plan.Buyer Visit
A buyer’s inspector may come to the supplier’s site. Lockheed Martin UK’s guidebook says such an inspector may re-inspect characteristics on a sample basis or witness the first article. The supplier has to give notice before the inspection is complete. For items with no source inspection, Lockheed asks for the first article report no less than 5 working days before shipment. That makes the visit a scheduling item for the buyer and the shop to agree before cutting starts.Coverage and Method
A first article inspection shows that the process can make the part. It does not measure every part of the lot, and the lot’s own inspection plan covers the rest. ASTM A967 works by lot as well, testing each lot of passivated parts by one of its listed practices. GKN Aerospace adds a rule for position. Coordinate measuring machine data alone is not accepted for a positional tolerance, and the report shows the actual positional value. Every characteristic of a first article report carries its method and its equipment. Lockheed Martin UK lists a visual method used for a dimension among its common errors. It asks for equipment at least 10 times more accurate than the accuracy required. ASTM A967 leaves the choice of practice to the buyer and the shop, and a salt spray test takes longer than a copper sulfate test. A purchase order that names “Practice F” names different tests depending on the edition it cites.Waiting Time
Inspection can stop a machine as surely as a broken tool. In the changeover study of these resources, the wait for inspection of the first piece took 58 minutes 26 seconds. That was 3.7 times the 15 minutes 57 seconds the piece took to make. The study proposed registering the first piece for priority inspection, with the check at no more than 10 minutes. A shop whose inspection room is busy leaves the machine standing between the first piece and the rest of the lot.Nonconformance
A report that identifies a nonconformance has the status of rejected in Lockheed’s guidebook. Nonconforming product does not go to the buyer without approval from the material review board, such as a waiver. The way back is corrective action, a subsequent build and an acceptable delta inspection. Remeasuring the same parts does not correct a failed characteristic. A late finding on a lot that was cut in full holds every part of it at once. A partial inspection then checks that the characteristics rejected earlier now conform.