DrawingAluminumFeature

Cycle Time of a Machined Part From Program to Time per Part

Time per part is cutting, moving, changing and handling plus the lot's share of setup, so check what a quoted cycle time includes before comparing.

A CNC machined aluminum part held in a plain machine vise beside a short row of finished identical parts.

A slab mill 114 mm (4.5 in.) across, taking a 6.35 mm (0.25 in.) deep cut along a 178 mm (7 in.) face, has to travel another 26 mm (1.03 in.) before its full diameter is in the work. At a feed of 27.7 mm (1.09 in.) per minute, that approach alone costs almost a minute of the 7.4-minute cut. The example comes from a milling equations sheet used in a Montana State University manufacturing course, and its lesson scales to every machined part: cycle time is not the length of the part divided by the feed, and the parts of the cycle nobody sees on the drawing are often the ones worth questioning.

What Makes Up the Cycle Time of a Machined Part

A CNC program’s time has three machine components. Autodesk’s help for the machining time tool in its CAM software defines the estimate as the sum of feed time, the time for non-cutting traverse moves at the machine’s fastest rate, and tool-change time, and it reports each with its distance and the number of tool changes. The traverse rate, it adds, comes from the machine tool’s maker.

Around those three sit the minutes the program does not count: loading and unloading the part, probing, and any in-process check. Together they make the cycle a buyer sees on a quotation.

Table 1. Components of a machined part’s cycle time, what each depends on and where it is calculated.
Component Depends on How it is estimated
Feed time toolpath length including approach and overrun, feed rate path length ÷ feed rate, by CAM or by hand
Traverse time non-cutting distance, machine traverse rate CAM, with the rate entered for the machine
Tool-change time number of tool changes, change time per tool CAM count × machine figure
Handling and checks fixture, part size, probing, inspection plan measured at the machine

The CAM tool also offers a feed scale that raises or lowers cutting, lead-in, lead-out, ramp and plunge feeds together, and Autodesk notes the usual trade: lower feeds generally give a better surface but lengthen the total time. That one control shows why cycle time and finish are decided together.

Cycle time is the sum of cutting, moving, changing and handling. Only the first appears in a feeds and speeds table.

Cutting Time From Length, Feed and Approach

The feed time of one cut follows from three quantities. The Montana State equations sheet gives the spindle speed N = v ÷ (π × D), the feed rate fr = N × nt × f, where nt is the number of teeth and f the feed per tooth, and the machining time Tm = (L + A) ÷ fr for peripheral milling, or Tm = (L + A + O) ÷ fr for face milling, where A is the approach distance and O the overrun.

Approach depends on the cut. In peripheral milling, the cutter has to travel A = √(d × (D − d)) before its full depth is engaged, with d the depth of cut and D the cutter diameter. In face milling with the cutter centered on the work, the sheet takes A and O each as half the cutter diameter.

Table 2. The two worked milling examples of the Montana State equations sheet, converted to metric.
Quantity Peripheral milling example Face milling example
Cutter diameter D 114.3 mm (4.500 in.), 20 teeth 15.9 mm (0.625 in.), 6 teeth
Depth of cut d 6.35 mm (0.250 in.) 9.53 mm (0.375 in.)
Width of cut w 44.5 mm (1.750 in.) 15.9 mm (0.625 in.)
Cutting speed v 39.2 m/min (128.5 ft/min) 30.5 m/min (100 ft/min)
Feed per tooth f 0.013 mm (0.0005 in.) 0.038 mm (0.0015 in.)
Spindle speed N 109 rpm 611 rpm
Feed rate fr 27.7 mm/min (1.09 in./min) 139.7 mm/min (5.50 in./min)
Length of cut L 177.8 mm (7.000 in.) 139.7 mm (5.500 in.)
Approach and overrun A = 26.2 mm (1.031 in.) A = O = 7.9 mm (0.3125 in.) each
Machining time Tm 7.36 min 1.39 min
Material removal rate 7.8 cm³/min (0.477 in.³/min) 21.1 cm³/min (1.289 in.³/min)

The non-cutting share of the cut is not small. In the peripheral example the approach adds about 15 % to the 178 mm cut; in the face milling example approach and overrun add about 11 % to a 140 mm cut. On a short feature cut by a large tool the share is larger still, which is why short faces milled with large cutters cost more time per millimeter than long ones.

A worked case of the same method shows how each input moves the result. Doubling the feed per tooth in the face milling example would halve the 1.39 minutes, while a longer part adds time in proportion to its length; approach and overrun stay fixed. Halving the cutter diameter would double the spindle speed at the same surface speed and shorten the approach as well.

Turning and Drilling Time

The same logic applies off the milling machine, with the feed given per revolution instead of per tooth. ETSU’s notes give the removal rates. For a lathe cut, the rate is the mean circumference of the work, taken halfway down the depth of cut, times the depth, times the feed per revolution, times the spindle speed. For drilling, it is the area of the drill’s circle, the diameter squared times π over 4, times the feed per revolution, times the spindle speed.

Time follows from the travel. A drill of 10 mm (0.394 in.) at 0.2 mm (0.008 in.) per revolution and 2,000 rpm advances 400 mm (15.7 in.) per minute, so a hole 30 mm (1.18 in.) deep takes about 4.5 seconds of feed, before the retract and the move to the next hole. On a plate with forty such holes, the drilling feed adds up to three minutes, and the retracts, the moves between holes and any pecking cycle come on top of it, which is exactly the share a feeds and speeds table leaves out.

Feed Rate From Spindle Speed, Teeth and Chip Load

Every feed time rests on the feed rate, and the feed rate rests on the chip each tooth is meant to cut. ISCAR’s milling guide sets out the chain in metric units: n = 1,000 × vc ÷ (π × d) for spindle speed, f = fz × z for feed per revolution and vf = fz × z × n for feed speed. Its example is an indexable face mill 100 mm (4 in.) across with 7 teeth, cutting annealed low-alloy steel at 180 m/min (590 ft/min) and 0.2 mm (0.008 in.) per tooth, which gives 573 rpm and a table feed of about 801 mm/min (31.5 in./min).

The University of Edinburgh’s makerspace states the same relationship from the operator’s side: feed rate equals spindle speed times the number of flutes times the chip load, with the chip load taken from the end mill’s datasheet. East Tennessee State University’s numerical control programming notes describe the classic method in the same order, choosing a chip load, typically 0.08 to 0.5 mm (0.003 to 0.020 in.), then the spindle speed, then multiplying by the number of teeth.

Two Inputs That Quietly Change the Answer

ISCAR names two details that a quick estimate misses. A ball-nose end mill cutting shallower than its radius cuts on a smaller effective diameter than its nominal size, so the real cutting speed is lower than the spindle speed suggests and is calculated on that effective diameter. And on some indexable cutters the number of inserts differs from the number of effective teeth, so the feed is calculated on the teeth that actually cut.

A feed that is too slow is not a safe default either. The ETSU notes point out that each tooth work hardens the surface it leaves, and that at too low a feed the next tooth cuts through that hardened layer instead of beneath it, dulling the edge. A conservative feed can lengthen the cycle and shorten tool life at the same time.

When Spindle Power Caps the Feed

A feed rate that a tooth can carry is not always a feed rate the spindle can drive. The ETSU notes give a simple model: the power at the spindle equals the material removal rate times a material machining factor, and the removal rate equals depth of cut times width of cut times feed rate.

Table 3. Material machining factors from ETSU’s numerical control programming notes, with the equivalent metric unit power.
Material Unit power, kW per cm³/min Factor as printed, hp per in.³/min
Aluminum 0.0055 0.12
Brass 0.018 0.4
Low-carbon steel 0.057 1.25
High-carbon and low-alloy steel 0.068 to 0.086 1.5 to 1.9
Stainless and tool steels 0.082 to 0.100 1.8 to 2.2
Superalloys 0.114 to 0.228 2.5 to 5.0

The notes work an example. A 25.4 mm (1 in.) end mill cutting 25.4 mm deep in low-carbon steel at 254 mm/min (10 in./min) removes 164 cm³ (10 in.³) per minute and needs about 9.3 kW (12.5 hp). On a spindle of 3.7 kW (5 hp), the feed has to drop to about 102 mm/min (4 in./min), and at 400 rpm with two flutes the chip load becomes 0.13 mm (0.005 in.) per tooth.

ISCAR’s guide gives the fuller version through specific cutting force: cutting power Pc = a × b × kc × vf ÷ (6 × 10⁷) in kilowatts, with the depths in millimeters, kc in N/mm² and vf in mm/min. Either way, the conclusion for cycle time is the same. On a small or light machine, the roughing cycle in steel is set by spindle power, not by the tool, and the same program can run in very different times on two machines.

Torque at Low Spindle Speed

Power is not the only limit. ISCAR’s guide converts cutting power into torque with Mc ≈ 9,550 × Pc ÷ n, in newton meters with power in kilowatts and speed in rpm. The ETSU example needs about 9.3 kW at 400 rpm, which is roughly 220 N·m (163 lbf·ft) at the spindle. A large face mill or a big drill turning slowly asks for torque more than for power, and a machine whose spindle gives its full power only at high speed may have to slow the feed for those tools even when its power rating looks sufficient.

A roughing cycle has two ceilings, the chip a tooth can carry and the power the spindle can give. The lower one sets the time.

Roughing and Finishing Rates in the Same Cycle

Most of a part’s volume leaves in roughing and most of its feed length is spent in finishing. Edinburgh’s page describes the balance: a high removal rate is faster, especially in roughing, but costs surface finish, tool wear and machine stress, while finishing passes run at a much lower removal rate to protect accuracy and surface.

That split suggests the way to estimate a cycle by hand.

  • Roughing time is roughly the volume to remove divided by the removal rate the machine and tool sustain, from Edinburgh’s MRR = axial depth × radial depth × feed rate.
  • Finishing time is the length of every finishing path, including approach and overrun, divided by its feed rate.
  • Non-cutting time is the traverse distance over the traverse rate, plus the tool changes counted by the CAM system.

A worked case with stated assumptions shows the proportions. Suppose a steel block loses 200 cm³ (12.2 in.³) in roughing at 40 cm³ (2.44 in.³) per minute, about 5 minutes, and then has 3,000 mm (118 in.) of finishing path at 600 mm (23.6 in.) per minute, another 5 minutes. Halving the roughing rate adds 5 minutes; halving the finishing feed for a better surface also adds 5 minutes. The two decisions weigh the same in the cycle, even though only one of them shows on the drawing.

From Cycle Time to Time per Part

Cycle time is what one part costs on the spindle. Time per part is what each part of a lot costs in machine time overall, and it adds the shares that one cycle does not show.

  1. The cycle time itself, cutting, traverse, tool changes and handling.
  2. The setup time of the lot, divided by the number of parts in it.
  3. The share of edge changes and tool replacements that fall within the lot.
  4. Any first-part checks and in-process inspection that stop the machine.

A short arithmetic shows why lot size dominates small runs. A 12-minute cycle with a 3-hour setup gives 12 + 180 ÷ 10 = 30 minutes per part in a lot of 10, and 12 + 180 ÷ 100 = 13.8 minutes in a lot of 100. In the small lot, setup is more than half of every part’s time; in the larger one it is about an eighth.

That is also why a faster cycle matters less in a short run than it appears. Cutting two minutes from the 12-minute cycle saves 20 minutes over a lot of 10, a small fraction of the 180-minute setup that the same lot carries.

Checking a Quoted Cycle Time

A cycle time on a quotation is an estimate built from the inputs above, and it holds only as well as they do. The CAM estimate Autodesk describes is calculated from the programmed feeds and speeds, the calculated toolpath distances and the traverse rate entered for the machine, so a wrong machine rate or a feed later reduced at the control moves the real time away from the estimate.

The questions worth asking are few and concrete.

  • Which machine and spindle the cycle assumes, since spindle power can cap roughing feeds.
  • Whether the time includes tool changes, traverse and handling, or only cutting.
  • How many setups the part needs, and how the setup time is spread over the lot.
  • Whether finishing feeds were set for the surface the drawing asks for.
  • Whether the estimate came from the CAM system or from a timed first part.

The last question matters most for a repeat order. A CAM figure is a calculation from the program; a time taken on the machine includes the feeds actually run, the handling and the checks the calculation leaves out, and the gap between the two tells a buyer how much of the quoted cycle was measured.

For parts moving from a first lot to repeat orders, the same breakdown shows where time can come out of the cycle and where it cannot. A buyer planning that progression can read about low-volume metal CNC and bridge production with the lot size and the critical surfaces already decided, since those two set most of the time per part.

Sources and Further Reading

Request a Metal CNC Quote

Send the 2D drawing and the 3D file, with the quantity and the stage of the project. An engineer replies within 1 working day.

The quote form, the mutual NDA and the private folder for your files are on Protolis Atelier, with Metal CNC chosen.

Request a Quote