Machine Time

Machine time is the time a machine is held by an order, whether it is cutting or standing still.

Every Machine Time article of the Metal CNC Resources, newest first, each written from published standards, research and makers’ data.

Meaning

Machine time is the time a machine is held by an order, whether it is cutting or standing still. Setup, tool changes and waits for inspection all spend it without making chips. Planning a lot is largely a decision about which of those to accept.

Setup Share

The SMED method separates setup work done while the machine stands still from work done while it cuts something else. In the changeover study, internal time was 1 hour 52 minutes 33 seconds. The proposed standard projects it at 42 minutes, by preparing tools and fixtures during machine time. The 47 minutes of external work then happen while the previous lot is cutting.
Read More

Tool Changes

A tool change takes machine time. Take an assumed case of two cutting speeds fitted to the Taylor tool life relation. A lot of 1,000 parts cuts for 4,000 minutes at the lower speed and 3,077 at the higher. With a change taking 3 minutes, the totals become 4,300 and 3,539 minutes. At 17 minutes per change the two speeds break even.

Pause for a Report

Cutting 2 parts of an assumed lot of 40 and waiting for the first article report costs machine time. The machine sits idle or goes to other work during the pause. In exchange, a finding falls on 2 parts instead of 40.

Utilization

The machine in the changeover study averaged about 65 % utilization over six years. Setup and adjustment is one of the six losses of overall equipment effectiveness, and the only one a buyer’s order creates directly.

Cycle Time of a Machined Part From Program to Time per Part

Time per part is cutting, moving, changing and handling plus the lot's share of setup, so check what a quoted cycle time includes before comparing.

What Makes Up the Cycle Time of a Machined PartA CNC program's time has three machine components. Autodesk's help for the machining time tool in its CAM software defines the estimate as the sum of feed time, the time for non-cutting traverse moves at the machine's fastest rate, and tool-change time, and it reports each with its distance and the number of tool changes.

Roughing and Finishing Passes in CNC Milling From Stock to Final Size

Rough to an even allowance, program the feed for the chip each pass really makes, and finish with a small constant depth so size depends on the tool, not the stock.

Roughing to Finishing in Milling, Pass by PassA milled part rarely reaches its size in one cut. The material is removed in stages, each with its own job, its own tool and its own engagement, and each leaves the next a predictable amount of stock.

How Setup Time Sets the Lot Size of a Machined Run

Setup is paid once per lot, so in lots of five to twenty parts the changeover sets the calendar and lot size decides how many parts share it.

What a Setup Contains Before the First Good PartThe study names nine groups of activity that the changeover consisted of, in the order they were done. Removing the fixture from the previous job came first, then study of the clamping sheet and the drawing, cleaning the machine, clamping the new fixture, positioning the zero point, measuring the tools, clamping the tools into the magazine, producing the first piece, and inspecting it.

How Many Parts One Cutting Edge Makes in a Machined Run

The parts an edge makes equal its minutes of life divided by the minutes each part spends on it, so a faster cycle can use more edges than it saves.

What Decides How Many Parts a Cutting Edge Can MakeParts per edge is a quotient. The numerator is the tool life, the minutes a cutting edge can stay in contact with the workpiece before it reaches the wear criterion.

First Article Inspection Before a Machined Metal Run

A machined run ships only after its first article report is approved, so plan the first delivery around the report and not around the last part off the machine.

What a First Article Inspection Does Before a Run ShipsLockheed Martin UK's guidebook gives the purpose in three lines. A first article inspection provides objective evidence that all engineering, design, contractual and specification requirements are correctly understood, accounted for, verified and recorded.

Request a Metal CNC Quote

Send the 2D drawing and the 3D file, with the quantity and the stage of the project. An engineer replies within 1 working day.

The quote form, the mutual NDA and the private folder for your files are on Protolis Atelier, with Metal CNC chosen.

Request a Quote