The first lot is the first quantity of parts made and released under an order, and it carries the first article of the run.

Every First Lot article of the Metal CNC Resources, newest first, each written from published standards, research and makers’ data.

Meaning

The first lot is the first quantity of parts made and released under an order, and it carries the first article of the run. Everything later lots repeat is fixed here: the program, the tooling, the treatment and the measuring method. For a small order, the first lot and the first article overlap in time. The first delivery date is then the date of the approved report, not the date the last part leaves the machine.

Release Rule

In a first article inspection, the inspected part comes from the first production run and may belong to the first lot of deliverable parts. Nothing in that lot ships until the buyer approves the report. Splitting a larger lot so that a first batch carries the first article protects the rest of it. In an assumed lot of 40 parts, cutting 2 first leaves 2 parts exposed to a late finding instead of 40.
Read More

Prior Checks

Some questions belong before the first lot and not after it. Whether a given geometry rinses clean after passivation is one, since blind holes and crevices hold acid. Which treatment and which test apply to each lot is another, because a change between lots changes the evidence.

Thermal State

A first lot on a machining center is often short enough that the machine never settles. HEIDENHAIN’s papers note that small batches never reach a stable thermal state, so the first workpiece sets the accuracy of the order. Recording the thermal state of the first parts gives later lots a reference. Where a first lot is released in small numbers, probed offsets keep the first parts and the later ones on the same datum.

Size Choice

In the changeover study of these resources, lots of 5 to 20 parts were dominated by setup time. A few more parts in the first lot cost little time and can save a later changeover.

Baseline Record

An approved first article report fixes the program revision, the tooling and the measuring equipment. Each later lot then starts from a recorded baseline, and a change to any of the three becomes a visible trigger.

Cycle Time of a Machined Part From Program to Time per Part

Time per part is cutting, moving, changing and handling plus the lot's share of setup, so check what a quoted cycle time includes before comparing.

What Makes Up the Cycle Time of a Machined PartA CNC program's time has three machine components. Autodesk's help for the machining time tool in its CAM software defines the estimate as the sum of feed time, the time for non-cutting traverse moves at the machine's fastest rate, and tool-change time, and it reports each with its distance and the number of tool changes.

Certificates and Documents That Ship With a Machined Metal Lot

Each document proves something different, so the order names the certificate type, the traceability, the process reports and the inspection data it expects.

The Documents That Travel With a Machined Metal LotA lot of machined metal parts usually travels with four kinds of paper, each issued by a different party and each proving something different. Confusing them is the most common reason a file looks complete and is not.

Thread Milling and Tapping Internal Threads in Metal Step by Step

An internal thread is decided at the drill, so gauge the minor diameter, size the drill to the engagement, then tap or mill with the entry and feed checked.

Tapping or Thread Milling for an Internal ThreadBoth methods start from the same drilled hole and end at the same gauge, and they differ in how the thread form gets into the wall. A tap cuts or forms the whole thread in one axial stroke, its size fixed by the tool.

Roughing and Finishing Passes in CNC Milling From Stock to Final Size

Rough to an even allowance, program the feed for the chip each pass really makes, and finish with a small constant depth so size depends on the tool, not the stock.

Roughing to Finishing in Milling, Pass by PassA milled part rarely reaches its size in one cut. The material is removed in stages, each with its own job, its own tool and its own engagement, and each leaves the next a predictable amount of stock.

Surface Roughness Ra by Machining Operation From Roughing to Grinding

The feed and nose radius of the last pass set the finish, so pick the process from the Ra band and measure with the cutoff the profile calls for.

Typical Ra From Turning, Milling and GrindingEach process leaves its own range. Keyence, a maker of roughness and profile instruments, publishes typical Ra values for finishing operations and stresses that real results depend on material, tooling and parameters.

ISO 1302 and ASME Y14.36 Surface Texture Symbols on a Machined Part Drawing

A surface symbol is read against the edition it cites, and its parameter suffix, lay mark and empty positions decide how the face is cut and inspected.

Which Standard Governs a Surface Texture Symbol TodayThe ISO symbol on most drawings in circulation was drawn to ISO 1302:2002, and that edition is now withdrawn. ISO's own catalogue page lists ISO 1302:2002 as withdrawn and names ISO 21920-1:2021 as the new version.

ASTM B117 Salt Spray Testing of Anodized and Plated Machined Parts

B117 sets the fog but not the hours, specimens or pass mark, so the order has to name the coating specification, the rating method and what was tested.

What ASTM B117 Controls and What It Leaves to the OrderASTM B117 is a practice for operating an apparatus. Its scope covers the equipment, the procedure and the conditions needed to create and keep a salt fog environment, and the apparatus it describes sits in an appendix.

How Setup Time Sets the Lot Size of a Machined Run

Setup is paid once per lot, so in lots of five to twenty parts the changeover sets the calendar and lot size decides how many parts share it.

What a Setup Contains Before the First Good PartThe study names nine groups of activity that the changeover consisted of, in the order they were done. Removing the fixture from the previous job came first, then study of the clamping sheet and the drawing, cleaning the machine, clamping the new fixture, positioning the zero point, measuring the tools, clamping the tools into the magazine, producing the first piece, and inspecting it.

First Article Inspection Before a Machined Metal Run

A machined run ships only after its first article report is approved, so plan the first delivery around the report and not around the last part off the machine.

What a First Article Inspection Does Before a Run ShipsLockheed Martin UK's guidebook gives the purpose in three lines. A first article inspection provides objective evidence that all engineering, design, contractual and specification requirements are correctly understood, accounted for, verified and recorded.

ASTM A967 Passivation for Machined Stainless Steel Parts

ASTM A967 names the baths and the lot tests for passivated stainless parts, and the drawing has to name the treatment, test and edition it wants.

What ASTM A967 Covers and What It Does NotASTM A967/A967M covers chemical passivation treatments for stainless steel parts, along with recommendations and precautions for descaling, cleaning and passivating. The abstract names three families of treatment: immersion in a nitric acid solution, immersion in a citric acid solution, and an electrochemical treatment.

Request a Metal CNC Quote

Send the 2D drawing and the 3D file, with the quantity and the stage of the project. An engineer replies within 1 working day.

The quote form, the mutual NDA and the private folder for your files are on Protolis Atelier, with Metal CNC chosen.

Request a Quote