First Article

A first article is the first production part measured against every characteristic of the drawing, and its approved report releases the rest of the lot.

Every First Article article of the Metal CNC Resources, newest first, each written from published standards, research and makers’ data.

Meaning

A first article is the first production part measured against every characteristic of the drawing, and its approved report releases the rest of the lot. The part comes from production tooling, production programs and the production process, so it speaks for the run that follows. A part cut on a trial setup and measured on its own does not carry the same weight. The first article inspection (FAI) report is the record of that measurement.

Purpose

Lockheed Martin UK’s supplier guidebook gives the purpose in three parts. The inspection shows that every engineering, contractual and specification requirement was understood, verified and recorded. It shows that materials, tooling, processes, documents and people can produce compliant parts consistently. It records that the part is fully compliant, defined, baselined and repeatable. The guidebook adds that the inspected part should not be a qualification unit, since qualification comes before the first article. The report does not measure every part of the lot, and the lot’s own inspection plan covers the rest.
Read More

Triggers

A full inspection covers every characteristic, and a partial or delta inspection covers those a change affects. A new part number, a new supplier or a new manufacturing location calls for a full one. A lapse in production of more than 2 years calls for one in the Lockheed, General Dynamics and GKN guides alike. A change of design, process, tooling, material, inspection method or numerical control program calls at least for a partial one. A buyer holding a repeat order for a part last cut three years ago should expect a first article again.

Report Forms

The report follows the three forms of AS9102. Form 1 identifies the part, its revisions and whether the inspection is full or partial. Form 2 accounts for materials, special processes and functional tests, with specification revisions and certificate numbers. Form 3 lists each characteristic with its requirement, its measured result and the method and equipment used. A ballooned drawing ties each balloon to a row of Form 3. Anodizing, heat treatment and plating belong on Form 2 with a traceable certificate number. Lockheed rejects a report whose special processor the buyer has not approved. A feature drawn in 12 places needs 12 recorded values, and “accept” or “OK” cannot replace a number.

Schedule Effect

Nothing in the lot ships until the buyer approves the report. Lockheed asks for the report no less than 5 working days before the shipment date where no source inspection applies. A rejected report stays rejected until corrective action, a subsequent build and an acceptable delta inspection are complete. For a small order, the first delivery date is therefore the date of the approved report. In an assumed lot of 40 parts, cutting 2 and reporting them before the other 38 limits a late finding to 2 parts. The pause costs machine time, and the guides’ rules explain why it pays.

Thermal State

A machining center that changes its work often never settles to one temperature. HEIDENHAIN measured a ball screw growing more than 110 µm (0.0043 in.) in 40 minutes of positioning. The first article therefore carries the machine’s thermal state, and it is cut after a warm-up that matches the production feed. It is measured again after a stretch of the lot. A probe cycle records the datum readings for the first article, so the later parts can be checked against the same reference.

Open Questions

The first article is where open questions meet actual metal. Edge sizes, deburring methods and finishes can be confirmed on the first parts instead of argued from notes. A tapped hole that is anodized can be gauged after coating, and a bore with an IT grade can be measured at a stated temperature. In the changeover study of these resources, the first piece waited 58 minutes 26 seconds for inspection. A first-piece check on a priority queue was planned at no more than 10 minutes.

Certificates and Documents That Ship With a Machined Metal Lot

Each document proves something different, so the order names the certificate type, the traceability, the process reports and the inspection data it expects.

The Documents That Travel With a Machined Metal LotA lot of machined metal parts usually travels with four kinds of paper, each issued by a different party and each proving something different. Confusing them is the most common reason a file looks complete and is not.

Thread Milling and Tapping Internal Threads in Metal Step by Step

An internal thread is decided at the drill, so gauge the minor diameter, size the drill to the engagement, then tap or mill with the entry and feed checked.

Tapping or Thread Milling for an Internal ThreadBoth methods start from the same drilled hole and end at the same gauge, and they differ in how the thread form gets into the wall. A tap cuts or forms the whole thread in one axial stroke, its size fixed by the tool.

Surface Roughness Ra by Machining Operation From Roughing to Grinding

The feed and nose radius of the last pass set the finish, so pick the process from the Ra band and measure with the cutoff the profile calls for.

Typical Ra From Turning, Milling and GrindingEach process leaves its own range. Keyence, a maker of roughness and profile instruments, publishes typical Ra values for finishing operations and stresses that real results depend on material, tooling and parameters.

Position Tolerance of Machined Hole Patterns Under ISO 1101 and ASME Y14.5

A position frame sets a round zone around exact locations from datums, and its material modifier decides whether that zone grows as the holes grow.

What a Position Tolerance on a Hole Pattern ControlsA position tolerance limits where the axis of a hole may lie. PTC's glossary of model-based definition terms, which sets the ASME and ISO wording side by side, defines it as a zone within which the center, axis or center plane of a feature of size may vary from a true, theoretically exact position.

ISO 1302 and ASME Y14.36 Surface Texture Symbols on a Machined Part Drawing

A surface symbol is read against the edition it cites, and its parameter suffix, lay mark and empty positions decide how the face is cut and inspected.

Which Standard Governs a Surface Texture Symbol TodayThe ISO symbol on most drawings in circulation was drawn to ISO 1302:2002, and that edition is now withdrawn. ISO's own catalogue page lists ISO 1302:2002 as withdrawn and names ISO 21920-1:2021 as the new version.

ASTM B117 Salt Spray Testing of Anodized and Plated Machined Parts

B117 sets the fog but not the hours, specimens or pass mark, so the order has to name the coating specification, the rating method and what was tested.

What ASTM B117 Controls and What It Leaves to the OrderASTM B117 is a practice for operating an apparatus. Its scope covers the equipment, the procedure and the conditions needed to create and keep a salt fog environment, and the apparatus it describes sits in an appendix.

How Setup Time Sets the Lot Size of a Machined Run

Setup is paid once per lot, so in lots of five to twenty parts the changeover sets the calendar and lot size decides how many parts share it.

What a Setup Contains Before the First Good PartThe study names nine groups of activity that the changeover consisted of, in the order they were done. Removing the fixture from the previous job came first, then study of the clamping sheet and the drawing, cleaning the machine, clamping the new fixture, positioning the zero point, measuring the tools, clamping the tools into the magazine, producing the first piece, and inspecting it.

First Article Inspection Before a Machined Metal Run

A machined run ships only after its first article report is approved, so plan the first delivery around the report and not around the last part off the machine.

What a First Article Inspection Does Before a Run ShipsLockheed Martin UK's guidebook gives the purpose in three lines. A first article inspection provides objective evidence that all engineering, design, contractual and specification requirements are correctly understood, accounted for, verified and recorded.

Setting Work Offsets With a Touch Probe Inside the Machine

A probe writes the part's datum into the work offset, so its calibration, its limits and its re-probe points decide how far the first parts can be trusted.

How a Probe Sets a Work Offset Before the First CutThe sequence on a machining center runs the same way for most parts. A probe is loaded in the spindle like a tool, and the control treats it as one.

Machining Center Thermal Drift and the Accuracy of the First Part

A ball screw grows with the heat of the work itself, so warm the machine at the production feed and check the datum before the first part counts.

Why a Cold Machine Cuts a Different Size Than a Warm OneA feed axis converts motor rotation to slide motion through a recirculating ball screw. When the control closes its position loop through a rotary encoder on the motor, the controlled quantity is the motor rotor position, and the slide position is inferred from the screw pitch.

How Burrs Form on Machined Aluminum and How They Come Off

A burr is the last chip, so its size follows the alloy, the temper and the tool, and a signed edge size on the drawing turns it into a measurement.

Why a Cutting Tool Leaves a Burr on AluminumA burr is a projection of material beyond the workpiece limits. Its opposite is a negative burr, a missing portion of the edge where material broke away instead of being pushed.

Request a Metal CNC Quote

Send the 2D drawing and the 3D file, with the quantity and the stage of the project. An engineer replies within 1 working day.

The quote form, the mutual NDA and the private folder for your files are on Protolis Atelier, with Metal CNC chosen.

Request a Quote