Report

A report is the document that records measured results for a part against its drawing, such as a first article or a dimensional report.

Every Report article of the Metal CNC Resources, newest first, each written from published standards, research and makers’ data.

Meaning

A report is the document that records measured results for a part against its drawing, such as a first article or a dimensional report. It names what was measured, how and with what. A report that also states the conditions of the measurement can be repeated by someone else. One that states only a verdict cannot.

Content

A first article report follows the three forms of AS9102: part accountability, materials and processes, and characteristics with their results. General Dynamics OTS adds a bubbled print, certificates, work instructions, test documents and a picture of the part marking to the package. A report that identifies a nonconformance has the status of rejected in Lockheed Martin UK’s guidebook.
Read More

Stated Conditions

For a default dimension under ISO 2768, a buyer can ask the report to name the class and the size row. A nominal 30 mm (1.18 in.) feature at 30.25 mm (1.191 in.) passes in one row and fails in the next. For flatness, the report states the support, so the reading can be repeated. For a long thin plate, the supplier reports the thickness, the support and the temperature with the result. An IT grade is only as good as the temperature on the inspection report.

Schedule Effect

Lockheed asks for the first article report no less than 5 working days before shipment where no source inspection applies. When an order requires a formal report, its measurement takes longer than a first-piece check. The buyer’s schedule then belongs to the measuring room as much as to the spindle.

Certificates and Documents That Ship With a Machined Metal Lot

Each document proves something different, so the order names the certificate type, the traceability, the process reports and the inspection data it expects.

The Documents That Travel With a Machined Metal LotA lot of machined metal parts usually travels with four kinds of paper, each issued by a different party and each proving something different. Confusing them is the most common reason a file looks complete and is not.

Surface Roughness Ra by Machining Operation From Roughing to Grinding

The feed and nose radius of the last pass set the finish, so pick the process from the Ra band and measure with the cutoff the profile calls for.

Typical Ra From Turning, Milling and GrindingEach process leaves its own range. Keyence, a maker of roughness and profile instruments, publishes typical Ra values for finishing operations and stresses that real results depend on material, tooling and parameters.

Position Tolerance of Machined Hole Patterns Under ISO 1101 and ASME Y14.5

A position frame sets a round zone around exact locations from datums, and its material modifier decides whether that zone grows as the holes grow.

What a Position Tolerance on a Hole Pattern ControlsA position tolerance limits where the axis of a hole may lie. PTC's glossary of model-based definition terms, which sets the ASME and ISO wording side by side, defines it as a zone within which the center, axis or center plane of a feature of size may vary from a true, theoretically exact position.

ISO 1302 and ASME Y14.36 Surface Texture Symbols on a Machined Part Drawing

A surface symbol is read against the edition it cites, and its parameter suffix, lay mark and empty positions decide how the face is cut and inspected.

Which Standard Governs a Surface Texture Symbol TodayThe ISO symbol on most drawings in circulation was drawn to ISO 1302:2002, and that edition is now withdrawn. ISO's own catalogue page lists ISO 1302:2002 as withdrawn and names ISO 21920-1:2021 as the new version.

ASTM B117 Salt Spray Testing of Anodized and Plated Machined Parts

B117 sets the fog but not the hours, specimens or pass mark, so the order has to name the coating specification, the rating method and what was tested.

What ASTM B117 Controls and What It Leaves to the OrderASTM B117 is a practice for operating an apparatus. Its scope covers the equipment, the procedure and the conditions needed to create and keep a salt fog environment, and the apparatus it describes sits in an appendix.

How Setup Time Sets the Lot Size of a Machined Run

Setup is paid once per lot, so in lots of five to twenty parts the changeover sets the calendar and lot size decides how many parts share it.

What a Setup Contains Before the First Good PartThe study names nine groups of activity that the changeover consisted of, in the order they were done. Removing the fixture from the previous job came first, then study of the clamping sheet and the drawing, cleaning the machine, clamping the new fixture, positioning the zero point, measuring the tools, clamping the tools into the magazine, producing the first piece, and inspecting it.

First Article Inspection Before a Machined Metal Run

A machined run ships only after its first article report is approved, so plan the first delivery around the report and not around the last part off the machine.

What a First Article Inspection Does Before a Run ShipsLockheed Martin UK's guidebook gives the purpose in three lines. A first article inspection provides objective evidence that all engineering, design, contractual and specification requirements are correctly understood, accounted for, verified and recorded.

ISO 286 IT Grades for Machined Holes and Shafts

An IT grade fixes the width of a size tolerance by nominal size, and temperature can use up most of the band before a part is measured.

What an IT Grade StatesISO 286 defines international tolerance grades for nominal sizes up to 3.15 m. A grade is a number prefixed with IT, from IT01 and IT0 through IT1 to IT18, and as the grade number rises the tolerance rises with it, and for a larger nominal size at the same grade it rises again.

Flatness of Machined Metal Plates

A plate's measured flatness depends on the stress in its stock, its temperature and its support, as well as on the cut that finished it.

What Flatness General Tolerances AllowA machined plate leaves the mill with faces cut flat. Where the drawing gives a face no flatness of its own, ISO 2768-2 sets the tolerance it is held to.

ISO 2768 General Tolerances for Machined Metal Parts

ISO 2768 sets a default band for every untoleranced size on a drawing, and the class letter in the title block decides how loose it is.

What ISO 2768 Covers and How a Drawing Calls ItThe standard comes in two parts. ISO 2768-1 sets general tolerances for linear and angular dimensions in four classes: f for fine, m for medium, c for coarse and v for very coarse.

Request a Metal CNC Quote

Send the 2D drawing and the 3D file, with the quantity and the stage of the project. An engineer replies within 1 working day.

The quote form, the mutual NDA and the private folder for your files are on Protolis Atelier, with Metal CNC chosen.

Request a Quote